• RCC was repaired and a new look was given
  • All plumbering work was completed and all five bathrooms are usable. Pavers were installed in the passage. 5 damaged acs were repaired and are now in workabale condition. Gutter were attached to the roof which has taken care of seepage. Generator was repaired and is now in workable condition. All electric work were done and deep cleansing of all three floors was done paving a comfortable path for the future leaders.

  • RCC Tinsukia
  • 01/06/2022
  • 29/06/2022
  • Community | Public Image
  • Club Fund
  • Donations from club members
  • 21
  • 2
  • 500
  • No. All were in cash

  • Rs 3,70,000